Note: We are not affiliated with the data centers or companies listed below. Listings are compiled from public sources and have not been independently confirmed by us — please verify directly with the company before relying on this information.
As of the latest update, USA has confirmed data center activity across 44 states and 341 cities, with 99 companies represented.
Aligned Data CentersPHX-01/02/03 Campus (Union Hills)AI DATA CENTERPENDING REVIEW The Phoenix campus spans 550,000 sq ft with 180 MW of capacity and hosts Aligned's Advanced Cooling Lab used to test AI/HPC cooling innovations.
Aligned Data CentersDFW-01 / DFW-04 Data CenterAI DATA CENTERPENDING REVIEW Aligned's DFW-04 facility in the Dallas market was built in partnership with AI cloud provider Lambda to deliver infrastructure engineered for Blackwell-generation GPU deployments.
Applied DigitalPolaris Forge 2AI DATA CENTERPENDING REVIEW Polaris Forge 2 is a 280MW AI facility that has been leased to Oracle and is expected to employ more than 200 workers once operational.
Applied DigitalJMS01AI DATA CENTERPENDING REVIEW JMS01 is a standalone 106MW HPC/AI facility financed in part through a $16 million loan from the Bank of North Dakota, according to a 2024 company announcement.
Applied DigitalPolaris Forge 1 (incl. ELN01)AI DATA CENTERPENDING REVIEW This campus hosts CoreWeave's AI and HPC infrastructure under an $11 billion, 15-year lease agreement covering up to 400MW of critical IT load.
Applied DigitalDelta Forge 1AI DATA CENTERPENDING REVIEW Delta Forge 1 near Boyce in Rapides Parish is a $3.6 billion, 430MW AI Factory campus expected to create 200 full-time jobs and about 1,000 construction jobs.
AWSProject Rainier (Mississippi campus)AI DATA CENTERPENDING REVIEW This companion Project Rainier campus in Madison County already exceeded 350 MW of Trainium2-based AI IT capacity as of late 2025, with plans to scale past 1 GW.
AWSProject RainierAI DATA CENTERPENDING REVIEW Project Rainier is a roughly $11 billion, 1,200-acre AI supercomputing campus that went fully operational in October 2025, running nearly 500,000 AWS Trainium2 chips dedicated to training Anthropic's Claude models.
CologixASH1 / ASH2AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Cologix's 120MW ASH1 facility in Ashburn was fully pre-leased in 2023, underscoring the intensity of hyperscale demand in the market, while a second building, ASH2, spans 226,000 sq ft and is Cologix-owned.
Core ScientificPecos CampusAI DATA CENTERPENDING REVIEW Core Scientific's CEO has described Pecos as a flagship site for converting crypto-era assets into flexible, AI-forward infrastructure, targeting up to 1.5 gigawatts of gross power.
Core ScientificAUBix Data CenterAI DATA CENTERPENDING REVIEW Core Scientific expanded into Alabama by leasing the existing AUBix data center in Auburn rather than building new, and it is one of the sites receiving AMD-backed AI hosting capacity announced in 2026.
Core ScientificDenton Data CenterAI DATA CENTERPENDING REVIEW Core Scientific is spending as much as $6.1 billion to refurbish this former crypto-mining facility into a dedicated AI hosting site.
Core ScientificDalton 1 & 2 / Old Tilton siteAI DATA CENTERPENDING REVIEW Dalton 1, launched in 2018, was equipped with Nvidia DGX hardware, and Core Scientific is now expanding the site with a new facility on Old Tilton Road planned to open by July 2026, bringing the Dalton footprint to about 195MW.
Core ScientificAustin Data CenterAI DATA CENTERPENDING REVIEW The Austin site was formerly Hewlett Packard's hosting and high-performance computing facility before Core Scientific acquired it in 2024.
Core ScientificHunt County CampusAI DATA CENTERPENDING REVIEW This 265-acre Hunt County campus is designed for 285MW of capacity, scalable to 430MW gross, with an on-site substation and initial power expected in 2027.
Core ScientificMuskogee Campus (Port of Muskogee)AI DATA CENTERPENDING REVIEW Built in partnership with CoreWeave and Port Muskogee, this 100MW facility broke ground in November 2024 specifically to host NVIDIA GPU clusters, with about 70MW of critical IT load, and Core Scientific has since agreed to acquire the adjacent Polaris Technologies site to expand the campus by roughly 440MW.
CoreWeaveCore Scientific Muskogee (Port of Muskogee)AI DATA CENTERPENDING REVIEW This 100MW facility, expected operational in 2026, is part of a 500MW, 12-year, $8.7 billion hosting contract between CoreWeave and Core Scientific dedicated to powering NVIDIA GPUs.
CoreWeaveCoreWeave Lancaster CampusAI DATA CENTERPENDING REVIEW CoreWeave committed up to $6 billion (later expanded to an $11 billion, 15-year deal for all available capacity) to build a purpose-built AI-exclusive data center campus replacing two former printing plants totaling 1.5 million square feet.
CoreWeaveApplied Digital Ellendale CampusAI DATA CENTERPENDING REVIEW Applied Digital agreed to two roughly 15-year leases delivering 250MW of critical IT load to CoreWeave at this campus, worth an estimated $7 billion in total revenue, with an option for an additional 150MW.
CoreWeaveHelios Campus (Galaxy Digital)AI DATA CENTERPENDING REVIEW CoreWeave signed a 15-year lease to be the sole AI/HPC tenant of this retrofitted campus, expected to generate over $1 billion annually for owner Galaxy Digital once fully operational in phases starting early 2026.
CrusoeCrusoe Goodnight CampusAI DATA CENTERPENDING REVIEW State tax-abatement filings describe an initial phase of up to four buildings and 530 megawatts, with research firm Cleanview reporting Google is working with Crusoe on this development.
CrusoeCrusoe Stargate Campus (Lancium Clean Campus)AI DATA CENTERPENDING REVIEW This 1.2GW campus, tied to OpenAI's Stargate program with Oracle as Crusoe's direct customer, went live in its first phase in September 2025 and is expanding to eight buildings after an $11.6 billion financing round.
CrusoeCrusoe-Tallgrass Wyoming CampusAI DATA CENTERPENDING REVIEW Announced in 2025 as a 1.8GW partnership with Tallgrass, this campus is reportedly designed to scale up to 10GW and sits several miles south of Cheyenne near the Colorado state line.
CrusoeCrusoe Warrenton CampusAI DATA CENTERPENDING REVIEW The 340-acre campus received a 75% personal property tax abatement from Warrenton in April 2026 and involves an estimated $8.36 billion in high-performance computing equipment for its first phase.
CyrusOneNVA9 Ashburn Data CenterAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW CyrusOne's NVA9 campus in Loudoun County is a roughly 700,000-square-foot data center development in the Ashburn area, one of the world's densest data center markets.
DataBankIAD2 / Culpeper Campus (Northern Virginia)AI DATA CENTERPENDING REVIEW IAD2 hosts the University of Maryland's Zaratan high-performance computing environment, and DataBank has since acquired 85 acres in Culpeper for a new two-building campus, whose first facility, IAD6, will offer 383,220 raised square feet.
DataBankATL1 (Georgia Tech Technology Square / CODA building)AI DATA CENTERPENDING REVIEW ATL1 was purpose-built inside Georgia Tech's CODA building as a high-performance computing center using innovative rear-door liquid cooling, described by industry press as one of the most advanced data centers in the country.
DataBankRed Oak CampusAI DATA CENTERPENDING REVIEW Announced in 2025, this 292-acre campus is DataBank's largest project to date, planned to house up to eight two-story data centers with up to 480 MW of capacity to meet surging AI computing demand.
DataVergeDataVerge Brooklyn Data Center (Industry City)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Independent sources including datacenterHawk and datacenters.com describe this as the largest connected/carrier-neutral interconnection complex in Brooklyn, situated inside the 16-building Industry City campus.
Digital RealtyACC4AI DATA CENTERPENDING REVIEW ACC4 is part of the legacy Ashburn campus originally built by DuPont Fabros, which Digital Realty acquired in a $7.6 billion, 12-data-center transaction completed in September 2017.
EdgeConneXEdgeConneX Atlanta (ATL01/ATL02)AI DATA CENTERPENDING REVIEW EdgeConneX designed and operates an air-cooled facility here (ATL02) specifically serving AI cloud provider Lambda as part of a 30MW+ dual-city AI infrastructure buildout.
EdgeConneXEdgeConneX Chicago (CHI03 / Ingenuity AI Factory)AI DATA CENTERPENDING REVIEW This Chicago campus is the site of a new build-to-density, single-tenant 23MW+ facility being built for AI cloud provider Lambda, using hybrid liquid-to-chip and air cooling for racks exceeding 600kW.
EdgeCore Digital InfrastructureEdgeCore Phoenix Campus (Mesa)AI DATA CENTERPENDING REVIEW EdgeCore's Mesa campus expansion, backed by a $1.9 billion debt financing round completed in 2024, made it the company's flagship Greater Phoenix data center campus.
EdgeCore Digital InfrastructureEdgeCore Louisa County Campus (Shannon Hill Regional Business Park)AI DATA CENTERPENDING REVIEW EdgeCore acquired 697 acres of land in Louisa County for $42 million to build a campus described as offering 1.1+ GW of capacity within network striking distance of Ashburn.
EdgeCore Digital InfrastructureEdgeCore Culpeper Campus / Culpeper Technology Zone (CTZ)AI DATA CENTERPENDING REVIEW The campus sits within the 690-acre Culpeper Technology Zone, and EdgeCore's plans call for a 1.4 million sq ft, three-building campus initially supporting 216 MW of critical IT load with potential to scale up to 432 MW.
Element CriticalHouston OneAI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW Houston One, previously Skybox Houston One and acquired by Element Critical in 2021, is undergoing a 10MW, AI-focused expansion with a new Data Hall 5 announced in November 2025 for generative AI, inference, LLM training and HPC workloads, with 4.5MW expected online by Q4 2026.
FlexentialAtlanta - Norcross Data CenterAI DATA CENTERPENDING REVIEW Flexential's planned Atlanta - Norcross 2 expansion, a 48,000-square-foot, 4.5-MW facility announced in 2026, is explicitly designed to support both enterprise and AI workloads.
FlexentialDenver - Compark (Englewood) Data CenterAI DATA CENTERPENDING REVIEW This Englewood site, also known as the Compark Data Center, is described as Flexential's largest facility in the Denver metro area.
Hut 8River BendAI DATA CENTERPENDING REVIEW River Bend is leased to AI infrastructure firm Fluidstack with Anthropic reportedly as the end-use AI tenant, backed in part by Google.
Hut 8Beacon PointAI DATA CENTERPENDING REVIEW Local officials and press describe Beacon Point as potentially the most compute-dense data center in the US, with a first phase fully leased under a $9.8 billion, 15-year contract.
Hut 8VegaAI DATA CENTERTIER IPENDING REVIEW Vega uses a proprietary, in-house-designed rack-based direct-to-chip liquid cooling system built for Bitmain ASIC miners, positioned as a bridge to high-density AI compute.
Iron Mountain Data CentersVA-1 / VA-2 Northern Virginia Data CentersAI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW VA-1 and VA-2 are part of an 83-acre, four-building planned campus expected to total roughly 1,000,000 square feet, with both existing buildings Uptime Institute Tier III certified.
LanciumLancium Clean Campus (Childress)AI DATA CENTERPENDING REVIEW Reported plans describe up to 10 data center buildings at this site with a planned investment of roughly $4 billion per site, potentially totaling $40 billion across the campus.
LanciumLancium Clean Campus (Abilene / Stargate 1)AI DATA CENTERPENDING REVIEW This is Lancium's flagship campus and the site of Project Stargate's first buildout, with Oracle announced as an anchor tenant and Crusoe expanding the facility to eight buildings and 1.2 gigawatts of total power capacity by 2025-2026.
LanciumLancium Clean Campus (Hall County)AI DATA CENTERPENDING REVIEW QTS announced plans in 2026 to build up to 11 data center buildings across roughly 465 acres on this Lancium-developed campus near the town of Turkey in Hall County.
LightEdgeLightEdge Minneapolis I Data CenterAI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW Acquired from Stream Data Centers in January 2024, this 76,000-square-foot, 3.6MW facility is designed to withstand 185 mph winds and is explicitly marketed by LightEdge as ready to support AI workloads with 50+ kW racks.
MetaHyperion Data Center Campus (Richland Parish)AI DATA CENTERPENDING REVIEW Announced in December 2024 and expanded since, Hyperion is Meta's largest data center ever, targeting up to 5GW of AI compute capacity, over 1.3 million GPUs including NVIDIA Blackwell, and a headline cost that has grown to more than $200 billion as of 2026.
MetaEl Paso Data Center CampusAI DATA CENTERPENDING REVIEW Announced in October 2025 as Meta's 25th US and 29th global data center, this nearly 1.2 million-square-foot AI-optimized campus can scale to 1GW and is being developed via an $14 billion joint venture with BlackRock announced in 2026.
Microsoft AzureFairwater Atlanta AI DatacenterAI DATA CENTERPENDING REVIEW This two-story, closed-loop liquid-cooled site houses NVIDIA GB200/GB300 Blackwell GPU racks and is directly fiber-linked to the Wisconsin Fairwater site as part of an "AI superfactory" network.
Microsoft AzureFairwater Wisconsin AI DatacenterAI DATA CENTERPENDING REVIEW Covering 315 acres with three buildings totaling 1.2 million square feet, this was Microsoft's first purpose-built Fairwater AI datacenter, announced in 2025.
Netrality Data Centers401 North BroadAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Home to an esports LAN center/training operation (Localhost), which relies on the building's low-latency connectivity for competitive gaming.
NJFXNJFX Cable Landing Station Colocation CampusAI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW It is recognized in industry press as the first and only U.S. colocation facility physically co-located with an active international submarine cable landing station, letting tenants connect terrestrial networks directly to subsea capacity without backhaul.
Novva Data CentersNovva West Jordan (Salt Lake City) CampusAI DATA CENTERPENDING REVIEW This flagship 100-acre campus is being expanded via a $2 billion financing package into what CIM Group calls one of the largest direct-to-chip cooled AI data centers in the world, on track to reach roughly 175MW.
NTT Global Data CentersChicago CH1/CH3 Data CenterAI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW The newer CH3 building is scheduled to open in December 2026 and is explicitly marketed as supporting advanced AI and cloud computing with 32MW of critical IT load.
Oracle Cloud InfrastructureDoña Ana County / Project Jupiter Data CenterAI DATA CENTERPENDING REVIEW STACK Infrastructure is developing this next-generation AI campus, called Project Jupiter, consisting of four large buildings designed for more than a gigawatt of AI capacity.
Oracle Cloud InfrastructureStargate Abilene AI Data Center CampusAI DATA CENTERPENDING REVIEW Crusoe reported that the first two buildings of this 1.2 GW, 980,000-square-foot phase went live in September 2025, and OpenAI's workloads were running less than a year after construction broke ground.
Oracle Cloud InfrastructureSaline Township / Project Jupiter Stargate CampusAI DATA CENTERPENDING REVIEW Announced in 2026 with Related Digital and Blackstone, this over-1-gigawatt campus in Washtenaw County was accompanied by a $10 million community grant for the Saline Recreation Center.
PowerHouse Data CentersPowerHouse CharlotteAI DATA CENTERPENDING REVIEW Sitting on a 122-acre site along University City Boulevard, the Charlotte campus was in the permitting phase as of January 2025 and is positioned as PowerHouse's entry into the Southeast U.S. market, near a Duke Energy substation with potential for up to 2.5 million sq ft of space.
Prime Data CentersLAX01AI DATA CENTERPENDING REVIEW LAX01 is described as Vernon's first AI-ready data center and became the site of a 2025 partnership with AI cloud provider Lambda to deploy NVIDIA Blackwell GPU infrastructure.
Prime Data CentersPHX01AI DATA CENTERPENDING REVIEW The Avondale mayor publicly credited the $3B PHX01 campus for using advanced closed-loop cooling technology that significantly reduces water usage while supporting AI and HPC workloads.
QTS Data CentersQTS Cedar Rapids CampusAI DATA CENTERPENDING REVIEW QTS broke ground on this campus using waterless cooling technology, explicitly citing AI-era demand for secure, scalable infrastructure as a driver of the project.
Sabey Data CentersSDC AustinAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Announced in 2022 as a $72 million-plus, up to 84MW expansion into the Austin tech hub, this campus was purpose-built to feature Sabey's latest space- and footprint-efficient construction innovations.
ScaleMatrixScaleMatrix San Diego Data Center (US-West 01)AI DATA CENTERPENDING REVIEW This facility is ScaleMatrix's founding headquarters campus and was nearly doubled in size when the company took an additional 46,000 sq ft at the Kearny Mesa campus, expanding from its original 50,000 sq ft footprint.
ScaleMatrixScaleMatrix Jacksonville Data Center (US-South 02)AI DATA CENTERPENDING REVIEW This facility is notable for being built to withstand severe weather with 15-inch reinforced concrete walls and 2N redundant power and cooling systems.
Skybox DatacentersSkybox PowerCampus TexasAI DATA CENTERPENDING REVIEW This 225-acre, up to 2-million-square-foot, seven-building campus developed with capital partner Blue Owl followed a $14.5 million land acquisition, with the first 150,000 sq ft building targeted for operation by late 2028.
Skybox DatacentersSkybox Houston CampusAI DATA CENTERPENDING REVIEW The original Houston One building used a market-leading 6-inch concrete roof deck rated for 190+ mph winds and DoubleDense technology enabling up to 1,000 watts per square foot with immersion cooling.
Skybox DatacentersSkybox Santa ClaraAI DATA CENTERPENDING REVIEW Built on the former Memorex Corporation campus (established 1961), the project became Skybox's largest and first Silicon Valley data center and included a public art installation preserving the site's Memorex history.
SolunaProject Kati 1AI DATA CENTERPENDING REVIEW Kati 1 became Soluna's largest operational site to date after energizing in early 2026, and drew an anchor customer relocating 48 MW of mining operations from its Texas Panhandle Helios campus.
SolunaProject Dorothy 1 (1A/1B)AI DATA CENTERPENDING REVIEW Project Dorothy 1 has been reported to achieve a power usage effectiveness of 1.01, an unusually efficient figure for a modular, wind-powered site.
STACK InfrastructureAI DATA CENTERPENDING REVIEW STACK's New Albany campus is a roughly 58-60MW facility expanding with 51MW of power-secured, turnkey high-density capacity due to deliver in Q1 2028.
STACK InfrastructureAI DATA CENTERPENDING REVIEW STACK's 2025-announced Chicago-area facility is a two-story, 263,000 sq. ft., 36MW data center built less than a mile from the existing CHI01 campus near O'Hare, powered by a local ComEd substation.
Stream Data CentersSATA1 (San Antonio II)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW SATA1 provides a distinct enterprise-class private data center product compared to Stream's larger wholesale campuses elsewhere in the metro.
Stream Data CentersAtlanta West CampusAI DATA CENTERPENDING REVIEW A Developments of Regional Impact filing shows Stream plans nine data center buildings and two substations across 246 acres in Douglas County, potentially reaching 280 MW.
SwitchThe Citadel Campus (SUPERNAP Tahoe Reno)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Upon full build-out this campus was announced as intended to be the largest data center campus in the world at 6.4 million square feet, with its first building alone reaching 1.2 million square feet and over 150MW of capacity.
SwitchThe Core Campus (SUPERNAP Las Vegas)AI DATA CENTERTIER IV GOLDCARRIER-NEUTRALPENDING REVIEW SUPERNAP 8 at this campus made industry history in 2014 as the first carrier-neutral colocation data center ever to receive an Uptime Institute Tier IV Gold certification.
SwitchThe Keep Campus (Switch Atlanta)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Businesses locating in this Georgia facility benefit from a 0% sales and use tax on colocation equipment under Georgia's data center tax incentive legislation.
SwitchThe Pyramid CampusAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW The campus is built around the distinctive glass "Switch Pyramid" building, one of the more visually unusual purpose-built data center structures in the country.
Tonaquint Data CentersOklahoma City Data Center (formerly EdgeX Data Centers)AI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW The facility is engineered to withstand tornado-force winds up to 310 mph with 12-inch-thick concrete walls and automatically sealing hydraulic louvres, reflecting its Tornado Alley location.
TRG DatacentersTRG Houston One (HOU1)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW HOU1 opened in 2018 and has maintained a claimed 100% uptime track record while serving more than 160 customers, including multiple Fortune 500 firms, and now runs operational NVIDIA Blackwell GPUs.
Vantage Data CentersFrontier CampusAI DATA CENTERPENDING REVIEW Frontier is Vantage's largest-ever announced investment at roughly $25 billion, spanning 1,200 acres and planned for 10 data centers totaling 3.7 million square feet with liquid cooling for GPU workloads.
Common Questions
How many data centers are in USA?
We've currently tracked 99 companies operating across 341 cities in USA — see the lists above. This reflects what we've researched so far, not necessarily every company or location present.
What are the major colocation and cloud providers in USA?
See the company list above, grouped by type.
Is there an AI data center in USA?
Yes — we've currently tracked 81 AI data centers from 39 companies in USA. See the AI Data Centers section above for the confirmed facilities.
Own or operate a data center in USA? Add your listing →
Looking for something else?
Disclaimer: This page was compiled with a structured research and verification process from publicly available sources. A human decides whether each page is published, but individual facts — addresses, contact details, and whether a company operates in a given location — are not independently fact-checked by us. Where you see a “Verified” badge, it means multiple independent sources agreed, not that we personally confirmed it. Companies open, close, relocate, and change contact details without always updating public records, so treat everything here as a starting point, not a confirmed source. If you're making a business decision, verify directly with the provider. Notice something outdated or incorrect? You're welcome to let us know — this site is updated periodically.