North America’s data center landscape is anchored by Northern Virginia’s “Data Center Alley” in Loudoun County, where an estimated 70% of global internet traffic passes through daily and, as of 2025, the region hosted close to 50 million square feet of data center space and more than 4,900 megawatts of commissioned power. But the center of gravity is shifting: as of mid-2026, Texas has cemented itself as the top state for data centers with 26 GW of existing and under-construction capacity versus Virginia’s 13 GW, while so-called “frontier markets” like West Texas, Ohio, Louisiana, Indiana and the Carolinas now account for 77% of all capacity under construction across the region. The region-wide numbers are staggering: North America had roughly 47 GW of commissioned capacity by the end of 2025 (a 12x increase from 2015), 66 GW under construction as of mid-2026 (95% pre-committed), and vacancy has held at just 1% for three consecutive years amid record demand from hyperscalers, neoclouds, and AI companies.
The most concrete example of AI-optimized infrastructure in North America is xAI's Colossus complex straddling the Tennessee-Mississippi border near Memphis. xAI converted a dormant former Electrolux appliance factory into an AI training plant in a matter of months, using liquid-cooled Supermicro racks packed with NVIDIA H100/H200 GPUs and NVIDIA's Spectrum-X networking fabric, and by early 2026 the cluster had grown into a three-building, roughly 2.6-million-square-foot complex approaching 2 GW of capacity with hundreds of thousands of GPUs, including capacity leased to rivals like Anthropic. Other gigawatt-scale AI campuses under development elsewhere in the region as of 2026 include OpenAI/Oracle's Stargate site in Abilene, Texas, Meta's Hyperion campus in Louisiana, and Microsoft's Fairwater AI facility near Atlanta, reflecting a broader industry shift toward purpose-built, power-intensive AI training facilities distinct from traditional colocation data centers.
Aligned Data CentersDFW-04AI DATA CENTERPENDING REVIEW DFW-04 hosts a dedicated AI infrastructure partnership with Lambda built around next-generation NVIDIA Blackwell platforms.
Aligned Data CentersLBB-01AI DATA CENTERPENDING REVIEW LBB-01 is the first of six planned buildings on the 313-acre, 540MW Caprock campus in Hale County, using a closed-loop cooling design meant to protect the Ogallala Aquifer.
Amanah TechTOR2AI DATA CENTERTIER IIICARRIER-NEUTRALPENDING REVIEW TOR2 opened in 2025 as a multi-million-dollar expansion built with Telehouse Canada, adding half a megawatt of redundant power and Enwave deep-lake water cooling to support up to 25kW-per-rack densities.
Amazon Web ServicesProject RainierAI DATA CENTERPENDING REVIEW Amazon executives describe this campus as the largest known deployment of non-Nvidia AI compute in the world, running entirely on AWS's own Trainium2 silicon.
Amazon Web ServicesAI DATA CENTERPENDING REVIEW This second Trainium2-based AI campus already exceeds 350 megawatts of IT capacity and is expected to surpass 1 gigawatt.
Applied DigitalELN02 (Polaris Forge 1 Building 1)AI DATA CENTERPENDING REVIEW This 100 MW building was the first phase of the Polaris Forge 1 AI Factory campus to reach full operational status, delivered under an $11 billion, 15-year lease to CoreWeave.
Applied DigitalELN03 (Polaris Forge 1 Building 2 / PF1 Bldg2)AI DATA CENTERPENDING REVIEW Building 2 of Polaris Forge 1 is slated for 150 MW of critical IT capacity and reached Phase 1 'Ready for Service' status as part of the campus's expansion toward 400MW total.
Applied DigitalJMS02AI DATA CENTERPENDING REVIEW JMS02 launched as a 5MW 'specialized processing center' designed to host GPUs for non-cryptocurrency machine learning workloads, initially with around 300 GPUs.
Applied DigitalPolaris Forge 2AI DATA CENTERPENDING REVIEW Polaris Forge 2 is a planned $3 billion, 900-acre, 280MW AI campus near Harwood leased largely to a major hyperscaler, expected to employ over 200 workers once operational.
Applied DigitalDelta Forge 1AI DATA CENTERPENDING REVIEW Delta Forge 1 is a $3.6 billion, 430MW AI Factory campus in Rapides Parish near Alexandria, marking Applied Digital's first Louisiana location and initially comprising two 150MW buildings on over 500 acres.
Bell Data CentresKamloops 1 (Mission Flats Road)AI DATA CENTERPENDING REVIEW This site, built inside the former Weyerhaeuser headquarters off Mission Flats Road, was Bell's first AI Fabric facility and houses 166 racks running Groq's inference chips.
Bell Data CentresKamloops - Thompson Rivers University (TRU) facilityAI DATA CENTERPENDING REVIEW This 26MW facility, built on the Thompson Rivers University campus, is designed to feed the university's buildings with the data centre's waste heat.
Bell Data CentresKamloops 3 (second Kamloops AI facility)AI DATA CENTERPENDING REVIEW
Bell Data CentresMerritt, BC AI data centreAI DATA CENTERPENDING REVIEW The Merritt site sits on land once approved for a cannabis grow-operation before being repurposed for Bell's AI infrastructure.
Bell Data CentresRegina AI data centre (RM of Sherwood campus)AI DATA CENTERPENDING REVIEW Billed as Canada's largest AI data centre, this 300MW campus outside Regina is pre-leased in full to AI companies CoreWeave and Cerebras under a $1.7 billion Bell investment.
CologixNNJ3AI DATA CENTERPENDING REVIEW NNJ3 is specifically called out on Cologix's own AI infrastructure page as purpose-built for high-density, AI-capable deployments.
CologixTOR4AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Completed in October 2023 through a joint venture with CIM Group, TOR4 is an 11MW, 50,000-square-foot purpose-built hyperscale facility that Cologix took full ownership of in September 2025.
Core ScientificDalton 1AI DATA CENTERPENDING REVIEW Launched in 2018, Dalton 1 was Core Scientific's first Dalton building and houses Nvidia DGX hardware.
Core ScientificMuskogee 1AI DATA CENTERPENDING REVIEW Located at the Port of Muskogee, this 100MW facility is designed to support Nvidia GB300 GPUs and represents more than $4 billion in capital investment.
Core ScientificAustin 1AI DATA CENTERTIER IIIPENDING REVIEW This facility formerly housed Hewlett Packard's hosting business, including high-performance computing, before Core Scientific acquired it in 2024.
Core ScientificDenton 1AI DATA CENTERPENDING REVIEW Core Scientific plans to spend as much as $6.1 billion refurbishing this site, which spans multiple buildings across two parcels, to turn it into an AI facility.
CoreSiteCH2AI DATA CENTERTIER IIIPENDING REVIEW CH2 is a 169,000-square-foot facility built in 2020 that has earned Energy Star recognition for its sustainability-focused construction.
CoreSiteDE3AI DATA CENTERPENDING REVIEW DE3, at 4900 Race Street, is the first purpose-built colocation data center constructed in Denver in the last two decades and is being developed through a joint venture with investment firm Stonepeak.
CrusoeAbilene Building 1AI DATA CENTERPENDING REVIEW This building was part of the first phase of Crusoe's Stargate-linked Abilene campus that went live on Oracle Cloud Infrastructure in September 2025, less than a year after construction began.
CrusoeAbilene Building 2AI DATA CENTERPENDING REVIEW Building 2 formed the other half of the two-building first phase of the Abilene campus, together totaling 980,000 square feet and 200+ MW.
CrusoeAbilene Building 5AI DATA CENTERPENDING REVIEW This specific building is described as a beacon of modern AI infrastructure with high-density data halls built for direct-to-chip liquid cooling or rear-door heat exchangers.
DartPointsTechnology CenterAI DATA CENTERPENDING REVIEW The 343,000-square-foot campus, formerly owned by Lexmark, was acquired by DartPoints from GigaCloud Technology for $29 million after roughly six and a half months on the market.
DataVergeCGNY2 (882 3rd Ave, 8th Floor)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW This is DataVerge's flagship, carrier-neutral meet-me room facility, and in 2026 the company signed a new 20-year lease to keep operating there.
DataVergeCGNY1 (882 3rd Ave, 9th Floor)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Industry City, the 16-building, 35-acre campus housing this facility, is described as the largest connected complex in the US, giving DataVerge direct rooftop and underground fiber connections throughout the park.
dcBLOXBHM1AI DATA CENTERPENDING REVIEW Built on the former 27-acre Trinity Steel site in downtown Birmingham, this facility is used by research customers including the University of Alabama at Birmingham for high-performance computing.
dcBLOXAtlanta West (ATL1)AI DATA CENTERPENDING REVIEW The 54-to-100-acre campus sits directly adjacent to Microsoft's 300-acre data center facility and just 2.5 miles from a Google facility.
Digital RealtyJFK10AI DATA CENTERPENDING REVIEW JFK10 hosts what was described as the first quantum-AI data center in New York City, combining Oxford Quantum Circuits' GENESIS quantum computer with NVIDIA GH200 Grace Hopper Superchips.
EdgeCoreSV02AI DATA CENTERPENDING REVIEW EdgeCore broke ground on this two-building Silicon Valley campus at 2201 Laurelwood Road in January 2023, and partnered with Zayo to bring dark fiber connectivity to the site.
EdgeCoreShannon Hill CampusAI DATA CENTERPENDING REVIEW Announced in June 2025, this 697-acre, $17 billion campus in the Shannon Hill Regional Business Park was purchased from Louisa County for $42 million and is planned to eventually include six data center buildings.
Element CriticalHouston OneAI DATA CENTERTIER IICARRIER-NEUTRALPENDING REVIEW Located in Houston's Energy Corridor, the building was acquired from Skybox Datacenters in March 2022, expanded with new halls later that year, and is currently being expanded again with a purpose-built AI-ready data hall.
eStruxtureCAL-3AI DATA CENTERTIER IIIPENDING REVIEW CAL-3 is being built as a 205,000-square-foot, Tier III facility offering rack densities of up to 125kW, positioning it as the largest data center in Alberta once complete and scheduled to come online in fall 2026.
FlexentialPhiladelphia - CollegevilleAI DATA CENTERPENDING REVIEW Flexential acquired this facility, a former GlaxoSmithKline data center, in 2017, and it now hosts a University of Pennsylvania NVIDIA DGX B200 SuperPOD research computing deployment.
FlexentialAtlanta - Douglasville 2AI DATA CENTERTIER IIIPENDING REVIEW This facility holds an Uptime Institute Tier III Design certification and uses chilled water piping technology for low-latency, high-density colocation.
Google CloudGoogle Southlands CampusAI DATA CENTERPENDING REVIEW The Southlands campus, opened in 2013, has grown to at least four large buildings totaling roughly 2.9 million square feet according to industry tracking.
HostDimeSuperNovaAI DATA CENTERTIER IVPENDING REVIEW Nicknamed "SuperNova," this bright orange, glass-wrapped seven-story building rising over Interstate 4 is described as the only enterprise Tier IV data center planned for Central Florida.
Hut 8Beacon PointAI DATA CENTERPENDING REVIEW Beacon Point's capacity is reportedly tied to Anthropic's $35 billion AI compute deal, with NVIDIA holding the lease on the facility and Lambda deploying NVIDIA chips there.
Hut 8River Bend CampusAI DATA CENTERPENDING REVIEW River Bend represents up to a $10 billion Phase I investment and was Hut 8's first AI data center campus commercialized under its power-first development model, with Phase One including two roughly 450,000 sq ft buildings.
HypertecHypertec LaSalle CampusAI DATA CENTERPENDING REVIEW The campus will host a $250 million Sovereign AI Research Hub developed with the Mila AI institute and 5C, offering up to 3MW of secure GPU compute capacity for researchers and startups.
Iron MountainMIA-1AI DATA CENTERTIER IIIPENDING REVIEW MIA-1 converts a former Iron Mountain records-storage building in Miami's Westview neighborhood into a data center, drawing local scrutiny over water and power use.
Iron MountainCHI-1AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW CHI-1 occupies a former Hart Schaffner Marx suit factory site, a project first announced in 2018 and only broken ground on in 2024 after years of delay.
Iron MountainRCH-1AI DATA CENTERPENDING REVIEW RCH-1 anchors a new Richmond-area campus at White Oak Technology Park that will neighbor existing Meta and QTS data centers.
LanciumAbilene Clean CampusAI DATA CENTERPENDING REVIEW This campus was named the first physical site of the $500 billion Stargate AI initiative announced by OpenAI, Oracle, and SoftBank in January 2025, with buildings on the site designed for up to 100,000 GPUs each.
LanciumChildress County Clean CampusAI DATA CENTERPENDING REVIEW Reports indicate Meta is in talks to lease AI computing capacity from Crusoe at this campus once it is built.
LightEdgeMinneapolis I Data Center (Chaska)AI DATA CENTERTIER IIIPENDING REVIEW Formerly a Stream Data Centers facility, the 76,000-square-foot, 3.6 MW campus is engineered to withstand 185-mile-per-hour winds and sits about 25 miles from Minneapolis-Saint Paul International Airport.
MetaPrometheusAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Prometheus is described as the world's first gigawatt-capable AI data center, built using an unusual patchwork of weatherproof tent structures, colocation space, and traditional buildings across New Albany Business Park.
MetaHyperionAI DATA CENTERPENDING REVIEW Hyperion is being built as Meta's largest data center in the world, at up to 10 million square feet and roughly 5 gigawatts, and is described as home to Meta's largest AI training cluster.
MetaCheyenne Data CenterAI DATA CENTERPENDING REVIEW This 715,000-square-foot, 960-acre campus is explicitly designed for AI workloads and departs from Meta's traditional 'H' building design.
MetaBowling Green Data CenterAI DATA CENTERPENDING REVIEW This 715,000-square-foot, 280-acre AI-optimized facility outside Toledo is powered in part by an on-site behind-the-meter generation setup.
MetaLebanon Data Center (LEAP District)AI DATA CENTERPENDING REVIEW This four-million-square-foot, 1,500-acre, 1GW campus is Meta's second major Indiana site and one of its largest single infrastructure investments, using a closed-loop, zero-water-most-of-the-year cooling system.
MetaEl Paso Data CenterAI DATA CENTERPENDING REVIEW This is Meta's 29th global data center, a 1GW AI-optimized campus that broke ground in October 2025 and aims for LEED Gold certification.
MetaBeaver Dam Data CenterAI DATA CENTERPENDING REVIEW This is Meta's 30th global data center, breaking ground in November 2025 and using dry-cooling technology aimed at zero water demand for cooling.
MetaTulsa Data CenterAI DATA CENTERPENDING REVIEW Announced in April 2026, this is Meta's first Oklahoma facility and its 32nd data center globally, representing over $1 billion in investment including $25 million-plus in local infrastructure.
Microsoft AzureFairwater 1 CampusAI DATA CENTERPENDING REVIEW This was Microsoft's first Fairwater AI datacenter, built on land originally set aside for a Foxconn manufacturing hub and completed with the help of nearly 10,000 construction workers.
Microsoft AzureFairwater 1 (Atlanta)AI DATA CENTERPENDING REVIEW Comprising buildings DC-9 and DC-10 on a QTS-owned campus, this was Microsoft's first operational Fairwater site in Georgia, running since October 2025.
Microsoft AzureFairwater 2 (Atlanta)AI DATA CENTERPENDING REVIEW This second Atlanta Fairwater building, comprising DC-1 and DC-2 on the same QTS campus, supports racks around 140kW and rows over 1,300kW of density.
Novva Data CentersWest Jordan Campus (Phase 1)AI DATA CENTERPENDING REVIEW This first phase, a 300,000-square-foot building, began operating in 2023 and served as the anchor of Novva's largest data center in Utah.
Novva Data CentersWest Jordan 2AI DATA CENTERPENDING REVIEW This second building, a 318,000-square-foot, 75MW data center, began construction in December 2023 as part of the campus expansion funded by a 2025 $2 billion loan.
Novva Data CentersWest Jordan 3AI DATA CENTERPENDING REVIEW This third building on the West Jordan campus is a 318,000-square-foot facility offering 72MW that began construction in January 2024.
Novva Data CentersNovva Tahoe RenoAI DATA CENTERPENDING REVIEW Located in the Tahoe-Reno Industrial Center, this was Novva's fourth completed facility, featuring six 10MW data halls and a dedicated 100MW N+1 substation from NV Energy.
Novva Data CentersNovva Mesa CampusAI DATA CENTERPENDING REVIEW Known internally as 'Project Borealis,' this $3 billion, 160-acre campus was Novva's sixth site and its first entry into Arizona, cleared for construction by Mesa's Planning and Zoning Board in early 2025.
Oracle Cloud InfrastructureStargate AbileneAI DATA CENTERPENDING REVIEW This campus is Oracle's flagship AI supercomputer site built with OpenAI as part of Project Stargate, planned to run on about 1.2 gigawatts of power.
phoenixNAPPHX01AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW This 200,000-square-foot facility, opened in 2010 near Phoenix Sky Harbor International Airport, functions as a major carrier hotel with over 30 carriers and is home to the DE-CIX Phoenix internet exchange.
phoenixNAPAshburn Data CenterAI DATA CENTERTIER 3 EQUIVALENTCARRIER-NEUTRALPENDING REVIEW phoenixNAP leases this space within a DataBank facility in Ashburn's Data Center Alley, offering a Tier 3-equivalent, 40MW environment supporting rack densities exceeding 10kW.
PowerHouse Data Centers1600 Digital Drive Data CenterAI DATA CENTERPENDING REVIEW Per PowerHouse Data Centers's own site: PowerHouse describes this Chesterfield County campus, developed with Chirisa Technology Parks, as featuring five AI-ready data center facilities totaling over 600,000 square feet.
PowerHouse Data CentersPennsylvania Digital I (PAX-1)AI DATA CENTERPENDING REVIEW Announced in 2025 with U.S. Senator Dave McCormick present, this 700-acre, three-campus, 18-building joint venture with Pennsylvania Data Center Partners is designed to deliver 1.35 GW (scalable to 1.8 GW) with direct peering to Ashburn, Virginia.
Prime Data CentersPHX01-01AI DATA CENTERPENDING REVIEW PHX01-01 marks the opening phase of Prime's Phoenix campus and uses a closed-loop cooling system engineered for zero process water use.
Prime Data CentersSJC03AI DATA CENTERPENDING REVIEW SJC03, at 2215 Martin Avenue, is a purpose-built Santa Clara data center explicitly marketed for high-density workloads such as AI.
Prime Data CentersSJC04AI DATA CENTERPENDING REVIEW SJC04, at 1231 Comstock Street, is a four-story, 119,000 sq ft data center Prime began building in 2023 as a purpose-built facility for high-density AI workloads.
QTS Data CentersAshburn 1 DC1AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Per QTS Data Centers's own site: QTS's own site states that Ashburn 1 offers standardized data-hall design with liquid cooling availability for high-demand workloads.
Sabey Data CentersSDC Austin Building AAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW This 430,000-square-foot building, completed in 2024, was chosen by the Texas Advanced Computing Center as the colocation home for its Horizon supercomputer, one of the largest open-science academic supercomputers in the U.S. National Science Foundation's portfolio.
Sabey Data CentersSDC Austin Building BAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Per Sabey Data Centers's own site: Sabey's own announcement describes Building B as a three-story, liquid-cooling-ready facility designed to deliver 54 megawatts of power capacity, with the first 18 megawatts ready for service in Q3 2027.
ScaleMatrixUS-West 01AI DATA CENTERPENDING REVIEW This San Diego campus was the first purpose-built multitenant data center constructed in the city in over a decade when it launched in 2011, and later nearly doubled in size with a 46,000 sq ft expansion.
ScaleMatrixUS-West 02AI DATA CENTERTIER 3+PENDING REVIEW Launched in 2019 as ScaleMatrix's third location, the site operates on the Centeris South Hill campus in Puyallup and was announced alongside partnerships with HPE and NVIDIA's DGX-Ready Data Center program for HPC/AI workloads.
Skybox DatacentersPowerCampus TexasAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW The 225-acre campus, developed with Blue Owl inside Oncor's deregulated power territory, is master-planned for up to seven buildings and 2 million square feet, with sub-three-millisecond latency to Dallas's Infomart.
SolunaProject Dorothy 1AAI DATA CENTERPENDING REVIEW Soluna took full ownership of this 25 MW site in 2026 after buying out its remaining outside investor's stake, and it sits directly beside the company's own Briscoe Wind Farm.
SolunaProject GraceAI DATA CENTERPENDING REVIEW This small 2 MW site sits about 3.7 miles from the Dorothy 1B building and is described as Soluna's AI pilot project supporting its move into HPC and machine learning.
SolunaProject Kati 2AI DATA CENTERPENDING REVIEW Kati 2 is being co-developed with metrobloks as a 100+ MW campus explicitly positioned for AI and HPC workloads, distinct from the Bitcoin-focused Kati 1 phase across the road.
SolunaProject SophieAI DATA CENTERPENDING REVIEW Sophie was Soluna's first site, going live in 2021 as a hydro-powered facility and later hosting the company's earliest AI hosting colocation pilot.
STACK InfrastructureDFW02AI DATA CENTERPENDING REVIEW The South Dallas campus in Lancaster is a 220MW, six-building development spanning 1.5 million square feet with committed power from a dedicated Oncor substation.
STACK InfrastructureNVA06AI DATA CENTERPENDING REVIEW Per STACK Infrastructure's own site: STACK states NVA06 is situated on 32 acres with a 48MW building and a following 24MW building, served by committed power from NOVEC, bringing its Northern Virginia portfolio to 1.2GW built or under development.
STACK InfrastructureResilient Tech ParkAI DATA CENTERPENDING REVIEW Approved by the Shreveport City Council in December 2025, the campus is designed for seven two-story buildings as part of a roughly $10 billion build-out, with Amazon covering 100% of utility infrastructure costs.
STACK InfrastructureStargate Campus (Doña Ana County)AI DATA CENTERPENDING REVIEW
Stream Data CentersPHXAAI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Stream's hyperscale data center campus in Goodyear, AZ, conveniently located in the metro Phoenix area, is emerging as the largest development of its kind in The Valley.
Stream Data CentersSan Antonio III (SATB1)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW Located at 11203 W Military Drive, this is Stream's third data center campus in the San Antonio region, and the company said the campus will feature a proprietary design with closed-loop chillers able to support a transition to Direct Liquid Cooling.
T5 Data CentersT5@Atlanta IVAI DATA CENTERPENDING REVIEW Per T5 Data Centers's own site: T5 describes this 91-acre, 200 MW campus as designed for cutting-edge AI capabilities and future-ready infrastructure with configurable N+1 or 2N redundancy.
T5 Data CentersT5@Chicago IIIAI DATA CENTERPENDING REVIEW This 250,000 SF, 36 MW building supports power densities up to 50kW per rack with both air and liquid cooling systems.
T5 Data CentersT5@Chicago V (CHI V)AI DATA CENTERPENDING REVIEW T5 called this its fourth project in the O'Hare submarket in recent years, acquired quickly to capitalize on limited available data center land in Chicago.
TierPointSt. Louis-Locust Data CenterAI DATA CENTERPENDING REVIEW The site is a historic 1917 building known as the NSI Building at 2300 Locust Street, which TierPoint is retrofitting with up to $150 million of investment into a data center with a planned 20MW of utility power.
Tonaquint Data CentersSt. George Data Center (Tonaquint Business Park)AI DATA CENTERCARRIER-NEUTRALPENDING REVIEW At its groundbreaking the developer described it as the only Tier III-rated data facility located between Salt Lake City and Las Vegas.
Tonaquint Data CentersOklahoma City Data Center (Newcastle Road, former EdgeX/Devon Energy facility)AI DATA CENTERTIER IIIPENDING REVIEW The building was originally constructed by Devon Energy and is designed to withstand tornado-force winds up to 310 mph while drawing power from the same grid that serves Will Rogers World Airport.
US SignalMI03 Detroit MetroAI DATA CENTERPENDING REVIEW Located near Detroit Metro Airport in Van Buren Township, this is one of US Signal's newer, higher-capacity facilities recently expanded for greater power density.
US SignalIA01 Des MoinesAI DATA CENTERTIER IIIPENDING REVIEW This Waukee facility is undergoing a multi-million-dollar expansion, adding 6 MW of new commercial power specifically to support high-density AI, cloud, and edge workloads.
Vantage Data CentersLighthouse CampusAI DATA CENTERPENDING REVIEW The Lighthouse campus is Vantage's most ambitious US project to date, with Oracle as anchor customer and OpenAI named in the joint announcement.
Vantage Data CentersNV1 CampusAI DATA CENTERPENDING REVIEW NV1 marked Vantage's entry into its eighth North American market, joining Google, Apple, and Microsoft in the growing Reno-area data center region.
Vantage Data CentersFrontier CampusAI DATA CENTERPENDING REVIEW Frontier is Vantage's largest global investment to date at over $25 billion, a 1.4GW campus of 10 data centers totaling 3.7 million sq ft in Shackelford County.
Common Questions
What is "Data Center Alley" and why is it so important?
Data Center Alley refers to the dense cluster of facilities in Loudoun County, Virginia (centered on Ashburn), which grew out of the relocation of the MAE-East internet exchange there in the late 1990s and Equinix's first data center nearby in 1998. Analysts estimate that roughly 70% of global internet traffic passes through the area daily, and Northern Virginia as a whole hosts over 300 data centers alongside 117 colocation sites and 31 internet exchanges.
What are the classic "carrier hotel" buildings in North America?
The two most historically significant are 60 Hudson Street in Manhattan (the former Western Union telegraph building, now a dense interconnection hub with tenants like Digital Realty, HudsonIX, DataBank, NYI, and Lumen) and One Wilshire in Los Angeles (a 664,000-square-foot building now also known as CoreSite LA1, serving as the core exchange point for trans-Pacific data).
Is Texas really overtaking Virginia as the top data center market?
By capacity under development, yes: as of mid-2026 Texas held 26 GW of existing and under-construction capacity, well ahead of Virginia's 13 GW, driven by Dallas-Fort Worth, Houston, Austin, and San Antonio, though Northern Virginia still leads on live, commissioned capacity today.
Is there AI-specific data center infrastructure in North America?
Yes — the clearest example is xAI's Colossus cluster near Memphis, Tennessee, a set of repurposed industrial buildings (including a former Electrolux appliance plant) that xAI converted into a liquid-cooled, GPU-dense AI training complex using Supermicro racks and NVIDIA Spectrum-X networking, reportedly reaching hundreds of thousands of GPUs and expanding toward roughly 2 GW of capacity by early 2026.
How are Canada and Mexico factoring into the North American market?
Canada's colocation market was projected to hit about USD 4.22 billion in 2026 (growing ~16.5% annually), helped by data-sovereignty rules and Montreal's cheap hydroelectric power, while Mexico's smaller but faster-growing market (around USD 1.2 billion in 2025) is being driven by nearshoring under the USMCA, concentrated in Mexico City and Monterrey despite grid constraints tied to state utility CFE.
Are there colocation providers in North America?
Yes — we've identified 107 colocation providers with a presence in North America, of which 1 is an AI colocation provider. See the company list above, and contact a provider directly to confirm current availability.
Are there cloud providers in North America?
Yes — we've identified 60 cloud providers with a presence in North America, of which 3 are AI cloud providers. See the company list above, and contact a provider directly to confirm current availability.
Looking for something else?
Disclaimer: This page was compiled with a structured research and verification process from publicly available sources. A human decides whether each page is published, but individual facts — addresses, contact details, and whether a company operates in a given location — are not independently fact-checked by us. Where you see a “Verified” badge, it means multiple independent sources agreed, not that we personally confirmed it. Companies open, close, relocate, and change contact details without always updating public records, so treat everything here as a starting point, not a confirmed source. If you're making a business decision, verify directly with the provider. Notice something outdated or incorrect? You're welcome to let us know — this site is updated periodically.