Note: We are not affiliated with the data centers or companies listed below. Listings are compiled from public sources and have not been independently confirmed by us — please verify directly with the company before relying on this information.
Meta Platforms operates a global network of data centers built purely to run its own products — Facebook, Instagram, WhatsApp, Messenger, Threads, and its AI systems including Llama — rather than to sell computing capacity or rack space to outside customers. As of 2025-2026, Meta’s fleet spans roughly 24-29+ data center campuses (with several more, including its first Canadian site, breaking ground), concentrated heavily in the United States but also reaching Ireland, Sweden, Denmark, Singapore, with announced future sites in Spain, Finland, and Alberta, Canada. Meta’s most distinctive recent shift is toward gigawatt-scale, AI-optimized “AI factory” campuses — most notably the Hyperion campus in Richland Parish, Louisiana, envisioned at up to 5GW and a headline cost exceeding $200 billion, built specifically to train and run large AI models rather than serve general social-media traffic. Because Meta does not offer colocation, cloud, or any infrastructure-as-a-service product to third parties, it is best classified as a self-operated facility operator rather than a commercial cloud or colocation provider, even though its physical footprint rivals or exceeds that of many hyperscale cloud companies.
8Countries
24Cities/Facilities
3AI Data Centers
Meta operates as a colocation provider and self-operated data center operator, with facilities at the following locations:
Alberta, CanadaSturgeon County Data CenterAI DATA CENTERPENDING REVIEW This is Meta's first data center in Canada, breaking ground in 2026 as its 33rd global facility, a 1GW AI-optimized campus representing an investment of more than CA$13 billion.
Odense, DenmarkOdense Data CenterPENDING REVIEW Meta's own materials describe a 10+ billion DKK investment in the Odense campus, with around 1,500 skilled trade workers on site at peak construction.
Ii, FinlandIi Data Center Campus (via Valoa Networks)PENDING REVIEW Meta, operating through its subsidiary Valoa Networks, is advancing plans for a massive data center campus in the municipality of Ii in Finland's Northern Ostrobothnia region.
Clonee, IrelandClonee Data CentrePENDING REVIEW Clonee's existing buildings earned LEED Gold certification and won Ireland's Green Construction Award, and the company recycled 97% of construction waste on the project.
Singapore, SingaporeSingapore Data Center (Tanjong Kling)PENDING REVIEW Announced in September 2018, this was Facebook's first data center in the Asia-Pacific region and uses a multi-storey, vertical design to fit Singapore's limited land availability.
Talavera de la Reina, SpainTalavera de la Reina Data Center CampusPENDING REVIEW Meta is building a major new data center campus near Talavera de la Reina, about 78 miles southwest of Madrid, marking one of its first sites in Spain.
Luleå, SwedenLuleå Data CenterPENDING REVIEW Luleå's cold Nordic climate lets Meta rely heavily on outside-air cooling and locally generated hydro-electric power, reducing backup generator needs by more than 70 percent.
Huntsville, Alabama, USAHuntsville Data Center CampusPENDING REVIEW Facebook's Huntsville project, previously known internally by the codename "Starbelt," was originally expected to launch in 2020 but faced delays.
Montgomery, Alabama, USAMontgomery Data Center CampusPENDING REVIEW Meta's Montgomery County campus represents an $800 million data center investment and its own site cites $1.5 billion+ invested with a 2024 groundbreaking.
Mesa, Arizona, USAMesa (Phoenix) Data CenterPENDING REVIEW The Mesa campus spans roughly 2.5 million square feet and came online in 2023.
Kuna, Idaho, USAKuna Data CenterPENDING REVIEW The Kuna, Idaho data center spans 960,000 square feet and represents an $800 million capital investment as part of Meta's roughly 19-data-center global network at the time of its announcement.
DeKalb, Illinois, USADeKalb Data CenterPENDING REVIEW The DeKalb data center became officially operational in December 2023, three years after construction began, and runs at roughly 250 MW.
Altoona, Iowa, USAAltoona Data CenterPENDING REVIEW The Altoona campus, which broke ground in 2013, consists of 10 data center buildings spanning roughly 5 million square feet, making it one of Meta's largest US sites.
Louisiana, USAHyperion Data Center Campus (Richland Parish)AI DATA CENTERPENDING REVIEW Announced in December 2024 and expanded since, Hyperion is Meta's largest data center ever, targeting up to 5GW of AI compute capacity, over 1.3 million GPUs including NVIDIA Blackwell, and a headline cost that has grown to more than $200 billion as of 2026.
Kansas City, Missouri, USAKansas City Data Center CampusPENDING REVIEW The Kansas City campus at 801 NW 128th St came online around 2024 and spans roughly 1 million square feet.
Papillion, Nebraska, USASarpy County (Papillion) Data CenterPENDING REVIEW The Sarpy County campus, located in Papillion/Springfield, Nebraska, broke ground in 2017 and became operational in 2019.
Los Lunas, New Mexico, USALos Lunas Data CenterPENDING REVIEW Meta announced an $800 million expansion of the Los Lunas data center campus, growing it into one of its largest facilities in the southwestern US.
Forest City, North Carolina, USAForest City Data CenterPENDING REVIEW This site is part of Meta's Forest City Campus, one of the company's earlier hyperscale sites in the southeastern US.
New Albany, Ohio, USANew Albany Data CenterPENDING REVIEW The New Albany site consists of five data center buildings spanning roughly 2.5 million square feet.
Prineville, Oregon, USAPrineville Data CenterPENDING REVIEW Prineville was Meta's first company-built data center and became the birthplace of the Open Compute Project, which open-sourced its server and data center designs.
Gallatin, Tennessee, USAGallatin (Nashville) Data CenterPENDING REVIEW The Gallatin campus, near Nashville, spans roughly 1.65 million square feet and came online in 2022.
El Paso, Texas, USAEl Paso Data Center CampusAI DATA CENTERPENDING REVIEW Announced in October 2025 as Meta's 25th US and 29th global data center, this nearly 1.2 million-square-foot AI-optimized campus can scale to 1GW and is being developed via an $14 billion joint venture with BlackRock announced in 2026.
Fort Worth, Texas, USAFort Worth Data CenterPENDING REVIEW When completed, the Fort Worth campus was designed as four buildings forming two "H" shapes plus a standalone center, totaling 20 data halls, making it one of Meta's largest builds at the time.
Temple, Texas, USATemple Data CenterPENDING REVIEW Meta announced the Temple, Texas hyperscale data center via press release, adding to its growing Texas footprint.
Meta's newest generation of data centers is being purpose-built for AI rather than general social-media workloads. The flagship is Hyperion in Richland Parish, Louisiana — a campus originally pitched at $10 billion in late 2024 that has since grown into a multi-gigawatt "Titan Cluster" AI factory projected to cost over $200 billion, using direct liquid cooling and housing over a million GPUs including NVIDIA Blackwell chips to train Llama models. Meta is applying the same AI-optimized, liquid-cooled approach to newer sites like El Paso, Texas (a 1GW campus that broke ground in 2025) and its first Canadian facility in Sturgeon County, Alberta (a 1GW, CA$13 billion campus that broke ground in 2026), both explicitly described by the company as built for AI rather than legacy workloads.
El Paso, USAEl Paso Data Center CampusAI DATA CENTERPENDING REVIEW Announced in October 2025 as Meta's 25th US and 29th global data center, this nearly 1.2 million-square-foot AI-optimized campus can scale to 1GW and is being developed via an $14 billion joint venture with BlackRock announced in 2026.
Louisiana, USAHyperion Data Center Campus (Richland Parish)AI DATA CENTERPENDING REVIEW Announced in December 2024 and expanded since, Hyperion is Meta's largest data center ever, targeting up to 5GW of AI compute capacity, over 1.3 million GPUs including NVIDIA Blackwell, and a headline cost that has grown to more than $200 billion as of 2026.
Alberta, CanadaSturgeon County Data CenterAI DATA CENTERPENDING REVIEW This is Meta's first data center in Canada, breaking ground in 2026 as its 33rd global facility, a 1GW AI-optimized campus representing an investment of more than CA$13 billion.
Common Questions
Does Meta sell cloud computing or colocation space to other companies?
No. Meta builds and runs its data centers exclusively to power its own products and AI systems; unlike AWS, Microsoft Azure, or Google Cloud, it does not offer compute, storage, or rack space as a commercial product to outside customers.
What is Meta's Hyperion data center and how is it different from Meta's older facilities?
Hyperion is Meta's AI-optimized campus in Richland Parish, Louisiana, announced in December 2024 and since expanded to a targeted 5 gigawatts of capacity with a headline cost exceeding $200 billion; unlike Meta's earlier general-purpose campuses, it is purpose-built with direct liquid cooling and high-density racks to train large AI models like Llama and support Meta Superintelligence Labs.
Where is Meta building its first data center in Canada?
Meta broke ground in 2026 on its first Canadian facility in Sturgeon County, Alberta, north of Edmonton — a 1GW, AI-optimized data center representing an investment of more than CA$13 billion and using a closed-loop liquid-cooled system with dry cooling.
Which of Meta's US data centers is specifically built for AI workloads?
Meta's El Paso, Texas campus, which broke ground in October 2025, is explicitly described by the company as an AI-optimized data center, using a closed-loop liquid-cooled system and designed to scale to 1GW to support AI training and inference.
Does Meta operate data centers outside the US and Canada?
Yes — Meta has long-operating campuses in Luleå, Sweden; Clonee, Ireland; Odense, Denmark; and Singapore, and as of 2025-2026 has announced plans for new campuses near Talavera de la Reina, Spain, and in Ii, Finland (via subsidiary Valoa Networks).
Looking for something else?
Disclaimer: This page was compiled with a structured research and verification process from publicly available sources. A human decides whether each page is published, but individual facts — addresses, contact details, and whether a company operates in a given location — are not independently fact-checked by us. Where you see a “Verified” badge, it means multiple independent sources agreed, not that we personally confirmed it. Companies open, close, relocate, and change contact details without always updating public records, so treat everything here as a starting point, not a confirmed source. If you're making a business decision, verify directly with the provider. Notice something outdated or incorrect? You're welcome to let us know — this site is updated periodically.