Note: We are not affiliated with the data centers or companies listed below. Listings are compiled from public sources and have not been independently confirmed by us — please verify directly with the company before relying on this information.
Aligned Data Centers is a Dallas-based developer and operator of large-scale, wholesale colocation and “build-to-scale” data centers, serving hyperscalers, cloud providers, AI neoclouds, and enterprise customers rather than selling cloud services itself. As of 2026 the company’s portfolio spans roughly 51 campuses and more than 6.4GW of operational and planned capacity across the Americas, concentrated in Tier I gateway markets such as Northern Virginia, Chicago, Dallas, Phoenix, and Salt Lake City, plus Latin American markets in Brazil, Mexico, Colombia, and Chile through its 2023 acquisition of ODATA. Aligned is best known in the industry for its proprietary DeltaFlow/Delta³ liquid- and air-cooling technology, engineered to support high-density GPU and AI accelerator workloads while minimizing water use, and for the record-breaking $40 billion acquisition of the company by a BlackRock/MGX-led consortium (the AI Infrastructure Partnership) that closed in July 2026 — one of the largest private digital-infrastructure deals ever. Founded in 2013 and long backed by Macquarie Asset Management, Aligned has grown from a single Plano, Texas campus into a multi-country platform explicitly positioning itself around AI-driven capacity demand, including a new 540MW, six-building campus (“Project Caprock”) breaking ground near Abernathy, Texas in 2026 and an AI infrastructure partnership with Lambda at its Dallas DFW-04 facility supporting NVIDIA Blackwell hardware.
5Countries
22Cities
30Facilities
2AI Data Centers
Aligned Data Centers has a confirmed data center presence at the following locations:
São João de Meriti, Rio de Janeiro, BrazilDC RJ01CARRIER-NEUTRALPENDING REVIEW Per Aligned Data Centers's own site: Aligned's Brazil site page states this facility is certified for PCI DSS and ISO 27001 and is built for near-zero water utilization via a closed-loop chilled water design.
Osasco, São Paulo, BrazilDC SP04PENDING REVIEW DC SP04 is a 295,000 sq ft, 48MW facility and the first ODATA site in Brazil to feature Aligned's award-winning Delta Cube cooling system.
Santana de Parnaíba, São Paulo, BrazilDC SP01CARRIER-NEUTRALPENDING REVIEW DC SP01 draws on about 19.4 MW of power and sits in the Greater São Paulo data center hub alongside facilities from Equinix and Ascenty.
Lampa, ChileODATA LampaCARRIER-NEUTRALPENDING REVIEW This facility sits in Lampa, one of the comunas that make up the greater Santiago data center market where Chile concentrates most of its colocation capacity.
Mosquera, ColombiaDC BG02PENDING REVIEW DC BG02 is planned within the Zona Franca de Occidente free trade zone with roughly 24MW of IT capacity as part of a $1.3 billion Colombian investment.
Tenjo, ColombiaDC BG03PENDING REVIEW DC BG03 is planned to be Colombia's largest data center upon completion, with up to 120MW of IT capacity designed to serve cloud and AI providers.
Phoenix, Arizona, USAPHX-01PENDING REVIEW PHX-01 anchors Aligned's Union Hills campus, which grew to 550,000 sq ft and 180MW of capacity across three expansion phases.
Phoenix, Arizona, USAPHX-04PENDING REVIEW PHX-04 was announced as a build-to-suit facility for an unnamed customer with an aggressive construction timeline.
Suwanee, Georgia, USAATL-01PENDING REVIEW ATL-01 is positioned near Atlanta's dense fiber ecosystem with direct cloud on-ramps to AWS, Microsoft Azure, Google Cloud, and Oracle Cloud.
Elk Grove Village, Illinois, USAORD-03PENDING REVIEW ORD-03 extends Aligned's Chicago-area footprint into Elk Grove Village, a separate suburb from its Northlake buildings.
Frederick, Maryland, USAIAD-06PENDING REVIEW IAD-06 is being developed as part of Quantum Frederick Park, a former industrial redevelopment site extending Aligned's Northern Virginia cluster across the Potomac into Maryland.
Hillsboro, Oregon, USAHillsboro CampusPENDING REVIEW Aligned's Hillsboro campus spans 27.2 acres at the intersection of NE 30th Avenue and NE Evergreen Road.
Abernathy, Texas, USALBB-01AI DATA CENTERPENDING REVIEW LBB-01 is the first of six planned buildings on the 313-acre, 540MW Caprock campus in Hale County, using a closed-loop cooling design meant to protect the Ogallala Aquifer.
Plano, Texas, USADFW-01PENDING REVIEW This 19-acre Plano campus building was Aligned's flagship facility and has been described as the first pay-per-use data center in the industry.
Plano, Texas, USADFW-02PENDING REVIEW DFW-02 was built as a second, roughly 220,000 sq ft, 36MW hyperscale building on Aligned's existing Plano campus.
Plano, Texas, USADFW-04AI DATA CENTERPENDING REVIEW DFW-04 hosts a dedicated AI infrastructure partnership with Lambda built around next-generation NVIDIA Blackwell platforms.
Salt Lake City, Utah, USASLC-03PENDING REVIEW SLC-03 was announced as a build-to-suit project adding roughly 100MW of capacity for a hyperscale customer.
West Jordan, Utah, USASLC-02PENDING REVIEW SLC-02 is the second building on Aligned's Salt Lake City-area campus, offering about 48MW of capacity.
West Valley City, Utah, USASLC-04PENDING REVIEW SLC-04 is the first facility of an approximately 270MW new data center development planned by Aligned in the Salt Lake City metro area.
Sterling, Virginia, USAIAD-03PENDING REVIEW IAD-03 is a four-story hyperscale building and Aligned's first facility located specifically in Sterling within its Northern Virginia campus footprint.
Aligned has flagged at least one facility with specific AI/GPU-oriented infrastructure: its DFW-04 data center in the Dallas market, where a partnership with AI cloud provider Lambda is built around NVIDIA Blackwell and Blackwell Ultra GPU hardware. Separately, the company's new Caprock campus near Abernathy, Texas — whose first building, LBB-01, is due online in 2027 — is described as placing high-density AI and cloud compute at the core of its design. Company-wide, Aligned's proprietary DeltaFlow/Delta³ liquid cooling platform is engineered specifically to support high-density GPU and AI accelerator workloads across its portfolio.
Plano, USADFW-04AI DATA CENTERPENDING REVIEW DFW-04 hosts a dedicated AI infrastructure partnership with Lambda built around next-generation NVIDIA Blackwell platforms.
Abernathy, USALBB-01AI DATA CENTERPENDING REVIEW LBB-01 is the first of six planned buildings on the 313-acre, 540MW Caprock campus in Hale County, using a closed-loop cooling design meant to protect the Ogallala Aquifer.
Common Questions
Who owns Aligned Data Centers?
As of July 2026, Aligned is owned by a consortium made up of the Artificial Intelligence Infrastructure Partnership (AIP), Abu Dhabi's MGX, and BlackRock's Global Infrastructure Partners, which completed a $40 billion acquisition of 100% of the company's equity from prior owner Macquarie Asset Management.
Does Aligned Data Centers have AI/GPU-specific infrastructure?
Yes — Aligned's DFW-04 facility in the Dallas market hosts a partnership with AI cloud provider Lambda built around NVIDIA Blackwell and Blackwell Ultra GPU infrastructure, and the company's DeltaFlow liquid cooling system is designed specifically to support high-density GPU and AI accelerator workloads.
Where does Aligned Data Centers operate outside the United States?
Through its 2023 acquisition of ODATA, Aligned operates data centers in Brazil, Mexico, Colombia, and Chile, in addition to its US campuses in Texas, Illinois, Arizona, Utah, Virginia, Maryland, Oregon, and Georgia.
What is Aligned's newest major data center project?
In April 2026, Aligned broke ground on "Project Caprock," a 540MW, 313-acre, six-building campus near Abernathy in Hale County, Texas, with its first building, LBB-01, targeted for a Q1 2027 service date.
Does Aligned Data Centers offer colocation services?
Yes — we've identified 30 facilities where Aligned Data Centers may offer colocation services. Please contact Aligned Data Centers directly to confirm current availability and terms.
Does Aligned Data Centers offer cloud services?
We haven't confirmed cloud services for Aligned Data Centers yet — this isn't a definitive no, since our research can miss things. Please contact Aligned Data Centers directly to confirm cloud availability.
Looking for something else?
Disclaimer: This page was compiled with a structured research and verification process from publicly available sources. A human decides whether each page is published, but individual facts — addresses, contact details, and whether a company operates in a given location — are not independently fact-checked by us. Where you see a “Verified” badge, it means multiple independent sources agreed, not that we personally confirmed it. Companies open, close, relocate, and change contact details without always updating public records, so treat everything here as a starting point, not a confirmed source. If you're making a business decision, verify directly with the provider. Notice something outdated or incorrect? You're welcome to let us know — this site is updated periodically.